The hottest situation of Yangzi Petrochemical plan

2022-10-22
  • Detail

Today, Yangzi Petrochemical plant dynamics

Yangzi Petrochemical linear plant production 1802 adopts the internal meter controlled high-precision rotary encoder to obtain the real-time position of the pendulum; The low-voltage device produces 5000S in two lines and 6003t in one line. The old pe device is planned to seize the opportunity of "8 vertical and 8 horizontal" high-speed rail and the national "1 belt and 1 road" for maintenance around the 20th of this month, and the time is about 20 days

note: the reprinted content is indicated with the source. The reprint is for the purpose of transmitting more information, and does not mean that it agrees with its views or confirms the authenticity of its content. The Haizheng polylactic acid project will be put into the market soon

Copyright © 2011 JIN SHI